国产哟哟

Skip to Main Content

Campus Construction Update

General
Share This Story

Summer means vacations, hot days, and lazy afternoons. It is also the height of construction time with a flurry of activity to be seen on roads and elsewhere—and 国产哟哟 is no exception.

Our Longmeadow campus is currently undergoing the following projects: installing new curbstones on the main and circular drive, as well as a sidewalk paralleling the main drive; creating a handicap accessible entrance for Hatch Library; updating lighting on campus; renovating North House; and transitioning D’Amour 1 to be the new E-portfolio and Advising Center. Here is a snapshot slide show of the projects. 

Share This Story